Saint-Colomban · La Rivière-du-Nord RCM
Building layout survey in Saint-Colomban
In short
In Saint-Colomban, many new homes are built on wooded lots, often with a well and septic system. The implantation plan places the house with the setbacks, slope and required distances in mind. Then we set the foundation markers on the date agreed with your builder.

What often comes up in Saint-Colomban
- Wooded lots: lines invisible before clearing
- Slope: foundation position and height
- Well and leaching field: distances from each other and from the house
- Front, side and rear setbacks under the municipal by-law
- Driveway and garage position
What the mandate includes
- Check of applicable rules: setbacks, servitudes, shoreline, constraint zones
- Implantation plan for the permit application
- Staking of building corners or grid lines before excavation
- A benchmark for foundation height
- Survey of the poured foundation, if the municipality or lender asks
The new-home sequence
On a wooded lot, order matters. First, staking the lines so you don't clear the neighbour's land. If the lot is sloped, a topographic survey for the architect and septic designer. Then the implantation plan for the permit, foundation staking and, when the work is done, the certificate of location.
Well, septic and house position
Without municipal water or sewer, the house, the well and the leaching field compete for space. Required distances between them and from the lines often shrink the buildable area. A plan that puts it all together avoids finding a problem when you start digging.
See also Land surveyor in Saint-Colomban.
Useful documents to send us
- The architect's or technologist's plans, with dimensions
- Your deed or lot number
- A topographic survey or existing certificate
- Your contractor's schedule
- Any requirements received from the municipality
Steps
How it works
-
Project review
We review your plans, the lot and the municipal rules that apply.
-
Implantation plan
We prepare the plan for your permit application.
-
Staking
We set corner or grid-line markers and the benchmark on the date agreed with your contractor.
-
Foundation survey
If needed, we confirm the position of the poured foundation before work continues.
House plans underway in Saint-Colomban? Let's book your staking.
FAQ
Frequently asked questions: building layout in Saint-Colomban
Do I need a topographic survey before the implantation plan?
On a sloped or heavily wooded lot, it's strongly recommended. The septic designer uses it too.
Can line staking and foundation staking be done together?
Often, yes, if the schedule allows. We discuss it when quoting.
Learn more
Building layout and Saint-Colomban
All about: building layout and implantation plan
What the surveyor checks, timelines, costs and frequently asked questions.
Land surveyor in Saint-Colomban
Other services requested in Saint-Colomban and the neighbouring municipalities we serve.
Building layout in other towns
No-obligation quote
Building layout in Saint-Colomban: your quote
Send us the property address and your deadline. We'll call to confirm the details, then send a written price and timeline.
- 418 265-9419
- info@arpenteurlaurentides.com
- 1534, rue Vinet, Val-David, QC J0T 2N0
- Monday to Friday, 8 a.m. to 5 p.m.